Work Progress as of November:
Section 6: Masonry of exterior and interior walls.
Section 5: Masonry of exterior and interior walls.
Section 4: Formwork installation for the 7th-floor slab and masonry on the 2nd floor.
TB Section: Masonry of the parapet.
Section 3: Formwork installation for the ground floor slab.