January 2025

Intro Background Image

  1. Section 1: Pile foundation works have started.
  2. Sections 2 and 2.1: Excavation of the foundation pit has been completed.
  3. Section 3: Monolithic columns of the fourth floor are being constructed.
  4. Section 4: Brickwork of the third floor is underway.
  5. Section 6.5: Window installation has been completed.