- Section 1: Pile foundation works have started.
- Sections 2 and 2.1: Excavation of the foundation pit has been completed.
- Section 3: Monolithic columns of the fourth floor are being constructed.
- Section 4: Brickwork of the third floor is underway.
- Section 6.5: Window installation has been completed.