Works performed as of August:
2.3 residential floors are being laid in 6 sections. The floor slab of the bottom of the 7th floor is being poured.
Work on the columns of the 6th floor is being carried out in the 5th section
Work is being carried out on the columns of the 4th floor in 4 sections
On the commercial part, work is being carried out on the columns of the 2nd floor